GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App, Long Life Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - (12-Mo Subscription Included)

GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App, Long Life Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - (12-Mo Subscription Included)

$138.48
Skip to product information
GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App, Long Life Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - (12-Mo Subscription Included)

GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App, Long Life Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - (12-Mo Subscription Included)

$138.48

About This

  • Enjoy peace of mind knowing your device comes with 12 months of subscription included. After 12 months, you can continue using the device with the flexible and transparent tariff plan you choose (check the product gallery to see the tariff plans).
  • Protect What Matters Most – Track your car, truck, or fleet in real time with our GPS tracker for vehicles. Get instant alerts on movement or unauthorized access, giving you peace of mind 24/7.
  • Stay in Control, Anywhere – Using our free iOS & Android app, view precise live locations anytime. The built-in SIM offers reliable 4G LTE tracking with flexible subscription plans
  • Discreet Yet Powerful – Our mini GPS tracker for vehicles is compact, waterproof (IP65), and easily hidden. Ideal as a car tracker device hidden from view for anti-theft protection No Tools Needed – Quick setup. Attach the device using strong magnets—no wiring, no hassle. Great for fleet tracking, teen drivers, or company vehicles
  • Long-Lasting Peace of Mind – Track for up to 14 days on a single charge. This tracking device for cars ensures uninterrupted monitoring when it matters most

Overview

  • Brand : MYLOC8
  • Special Feature : Alert Notification, Geo-Fence, Location History, Real Time Tracking, Weather Resistant
  • Connectivity Technology : 4G, Bluetooth, Wi-Fi
  • Supported Application : GPS (iOS, Android), Web Platform
  • Specific Uses For Product : Commercial GPS Tracking, Vehicle GPS Tracking, Worldwide GPS Tracking

Reviews

⭐⭐⭐⭐⭐

Motexa has become my go-to store for cycling gear. The quality of the products and the smooth ordering experience made a big difference. Everything feels well selected for real riders.

— Daniel R.

⭐⭐⭐⭐⭐

I’ve tried several online bike shops, but Motexa stands out. The gear feels premium and reliable, and shipping was faster than expected. Definitely coming back for more.

— Michael T.

⭐⭐⭐⭐⭐

Great selection of cycling essentials. I picked up lights and accessories and they’ve been perfect for my daily rides. Motexa makes it easy to find what you need.

— Sarah L.

⭐⭐⭐⭐⭐

Really impressed with the overall experience. Clean website, solid product options, and everything arrived exactly as described. Highly recommended for cyclists.

— Kevin M.

You may also like

BEST Items

View all

Frequently asked questions

What does Motexa sell?


Motexa specializes in cycling gear, bikes, and essential accessories designed for road riding, mountain biking, commuting, and everyday cycling. Our goal is to provide reliable products that help riders enjoy every journey.

How much does shipping cost?


Shipping is a flat rate of $6.90 per order. This simple pricing ensures consistent delivery costs regardless of the product or order size.

Do you offer free shipping?


At this time, we do not offer free shipping. Every order has a flat $6.90 shipping fee, which helps us maintain reliable delivery and product quality.

How long does delivery take?


Most orders are processed within 5–10 business days. Delivery typically takes 7–20 business days, depending on your location and the product availability.

Can I track my order?


Yes. Once your order is shipped, you will receive a tracking number by email so you can monitor the delivery progress of your package.

What if my item arrives damaged?

If your item arrives damaged or defective, please contact us within 48 hours of delivery with photos of the issue. Our team will review the case and help resolve it as quickly as possible.

Can I cancel or change my order?

Orders can usually be changed or canceled within 12 hours after placing the order. After that time, the order may already be in processing and cannot be modified.

Do you ship internationally?

Motexa currently ships to the United States and selected international regions. Shipping availability may vary depending on the product and delivery location.

Are your products suitable for professional riders?

Our catalog includes products suitable for casual riders, commuters, and cycling enthusiasts. We carefully select gear that balances performance, reliability, and everyday usability.

How can I contact Motexa support?

If you have any questions about your order or our products, you can contact us through the Contact Us page on our website. Our support team will respond as soon as possible.