GPS Tracker for Vehicles Cars Motorcycles,No Monthly Fee No Subscription,Real-Time Location Tracking Device, Magnetic Mini GPS Tracker for Car Pets Dogs Elderly and Valuables (TG22)

GPS Tracker for Vehicles Cars Motorcycles,No Monthly Fee No Subscription,Real-Time Location Tracking Device, Magnetic Mini GPS Tracker for Car Pets Dogs Elderly and Valuables (TG22)

$60.29
Skip to product information
GPS Tracker for Vehicles Cars Motorcycles,No Monthly Fee No Subscription,Real-Time Location Tracking Device, Magnetic Mini GPS Tracker for Car Pets Dogs Elderly and Valuables (TG22)

GPS Tracker for Vehicles Cars Motorcycles,No Monthly Fee No Subscription,Real-Time Location Tracking Device, Magnetic Mini GPS Tracker for Car Pets Dogs Elderly and Valuables (TG22)

$60.29

About This

  • 1️⃣【No Subscription No Monthly Fee No SIM】This GPS tracker requires no subscription, no monthly fee and no SIM card, working with a free app on Android and iOS for real-time GPS location updates; a cost-effective car GPS tracker and vehicle tracking device suitable for cars, motorcycles, pets, dogs, elderly items and valuables.
  • 2️⃣【Mini Magnetic GPS Tracker Design】Mini GPS tracker measures only 1.3 inches and 0.5 oz and includes an upgraded strong magnet for secure placement on cars, trucks, motorcycles, metal surfaces, luggage or bags, helping support fleet tracking, rental vehicle management and daily car protection without complex installation.
  • 3️⃣【Route History Trajectory Playback】GPS tracking device supports route history playback with time period filtering so you can review the travel path, stops and movement history for cars, pets, family items or valuables anytime, helping support daily vehicle tracking and item management without opening the app frequently.
  • 4️⃣【Real Time Location Tracking Updates】Real-time GPS tracking device provides timely location updates through the app, suitable for vehicles, cars, motorcycles, pets, dogs, luggage and valuables, helping you stay informed about movement and ensuring better tracking for driving, travel and everyday use.
  • 5️⃣【Long Battery Life Replaceable Cell】This long battery life GPS tracker uses an upgraded lithium battery supporting extended standby time of up to two years under normal tracking frequency; when power runs out, the battery can be replaced easily, making it practical for long-term vehicle tracking and personal item use.

Overview

  • Brand : Quvjd
  • Special Feature : gps tracker
  • Connectivity Technology : GPS
  • Supported Application : Email
  • Specific Uses For Product : GPS Tracker for Vehicles

Reviews

⭐⭐⭐⭐⭐

Motexa has become my go-to store for cycling gear. The quality of the products and the smooth ordering experience made a big difference. Everything feels well selected for real riders.

— Daniel R.

⭐⭐⭐⭐⭐

I’ve tried several online bike shops, but Motexa stands out. The gear feels premium and reliable, and shipping was faster than expected. Definitely coming back for more.

— Michael T.

⭐⭐⭐⭐⭐

Great selection of cycling essentials. I picked up lights and accessories and they’ve been perfect for my daily rides. Motexa makes it easy to find what you need.

— Sarah L.

⭐⭐⭐⭐⭐

Really impressed with the overall experience. Clean website, solid product options, and everything arrived exactly as described. Highly recommended for cyclists.

— Kevin M.

You may also like

BEST Items

View all

Frequently asked questions

What does Motexa sell?


Motexa specializes in cycling gear, bikes, and essential accessories designed for road riding, mountain biking, commuting, and everyday cycling. Our goal is to provide reliable products that help riders enjoy every journey.

How much does shipping cost?


Shipping is a flat rate of $6.90 per order. This simple pricing ensures consistent delivery costs regardless of the product or order size.

Do you offer free shipping?


At this time, we do not offer free shipping. Every order has a flat $6.90 shipping fee, which helps us maintain reliable delivery and product quality.

How long does delivery take?


Most orders are processed within 5–10 business days. Delivery typically takes 7–20 business days, depending on your location and the product availability.

Can I track my order?


Yes. Once your order is shipped, you will receive a tracking number by email so you can monitor the delivery progress of your package.

What if my item arrives damaged?

If your item arrives damaged or defective, please contact us within 48 hours of delivery with photos of the issue. Our team will review the case and help resolve it as quickly as possible.

Can I cancel or change my order?

Orders can usually be changed or canceled within 12 hours after placing the order. After that time, the order may already be in processing and cannot be modified.

Do you ship internationally?

Motexa currently ships to the United States and selected international regions. Shipping availability may vary depending on the product and delivery location.

Are your products suitable for professional riders?

Our catalog includes products suitable for casual riders, commuters, and cycling enthusiasts. We carefully select gear that balances performance, reliability, and everyday usability.

How can I contact Motexa support?

If you have any questions about your order or our products, you can contact us through the Contact Us page on our website. Our support team will respond as soon as possible.